I am running DPM on a 2012 R2 server. The backups go to the servers local SCSI hard drives. I want to replace the existing drives with new ones. If I simply take the server down, replace the drives, and bring up the server, will I be able to add the new
drives to DPM and have DPM start using them? I don't care about losing the old backups, I just want DPM to create new backups on the new drives. My concern is that DPM will get all confused because it can't see the backups that it created previously. I am
trying to accomplish this without having to go through a lot of reconfiguration.
↧